Thursday, September 3, 2009
More updates
Sunday, July 26, 2009
Building is a Breeze
The breezeway is built!
Looking straight through from our livingroom doorway, through the breezeway and into Mom's doorway leading into her house.
Ryan framing the back breezeway wall.
Breezeway enclosed with the sheathing. Picture taken from our soon-to-be livingroom.
Front view of the house. the cut out in the center of the picture will eventually be the front door, which leads into the breezeway. Enter and turn left for Mom's house and turn right for our's.
The weeds will be replaced by wood decking and it will all look much better soon! More progress coming this week. There is rain in the forecast but the temperatures will be in the high 80s to low 90s.
Next steps will be doors and electrical work.
Wednesday, July 8, 2009
Major case of the shingles
Above and below are some more pics of the few days before shingle day.
And below is the result of yesterday's work. Ryan and his friend Colton did an EXCELLENT job installing an entire side of roof shingles (See the right side of the roof). Thanks guys!
See the window installed there to the right of the ladders? That is the dining room window! The ladders are blocking the huge livingroom window opening. We hope to finish the roof and get all windows and doors installed so the electrician can come in and wire it up. Dare I say that list of "chores" will be done by this weekend?
Stay tuned!
Stay tuned!
Friday, July 3, 2009
Raising the roof!
The weather is great today, and Eddie, Jay's construction manager at work, came down to build a house on his day off. What a guy! Thank you Eddie!
This is the truck delivering the trusses the other day.




Ta-Da! Trusses up!
And these are the guys hard at work!
Our computer no longer wants to connect to the internet, so posts will bea little sporatic (so what's new?) but rest assured, we will still keep you posted with lots of pics!
Thursday, June 25, 2009
More progress
(Taken fom Poppe's living room, looking towards Mom's bathroom area through the opening onthe right. Observe the plumbing sticking up from the concrete)
Sheathing is going up all around the house and the breezeway between Mom's house and our soon-to-be living room are going up! Yeah, the pictures may look like it is crooked, but they are spot-on straight. I just had the camera a little crooked, as I was keeping Fulton's curious hands away from the camera!
Some people came by today to take measurements for the trusses (that's the part of the house that look like whale ribs for the roof) Delivery for those should be next week!
(View through Mom's front living room window)
And to show that we are not all work and no play, you will see that the carpenter and his son are having fun!
Monday, June 22, 2009
Walls well that ends well
Saturday, June 20, 2009
Walls UP!
Things got pretty hot, so Jay took a break after lunch (103 degrees with no shade - can you blame him?) and this is what the rest of the day brought us! YAY!!!
Here is Jay standing in the bedroom. The small square in front of him will be where the water heater will reside. Further ahead of him in the top right corner of the house is the bathroom (that large square) and walk-in closet ( from the far upper right hand corner running along that back wall to the bedroom area towards Jay), accessed through the bathroom. The bottom lefthand side will be the livingroom, slowly morphing into the dining area and kitchenette. When you hit the wall on the far right towards the bottom, you will see her "front" doorway, which you can access through the breezeway connecting our two homes.
Next step - we build the interior walls and install them on Monday!
Subscribe to: